Jump to Page Content City of Cambridge Home Page
Administration Distribution Engineering Water Operations Watershed Water Board Home
Water Department Home
Cambridge Water Department
Printer-friendly Version
Water Department Home
Areas of Interest
Fresh Pond Master Plan
Northeast Sector Project
Fresh Pond Reservation Drainage and Habitat Improvements
Aerial Photos of Recent Improvements
Restoration Projects at Fresh Pond Reservation
Fresh Pond Kids' Walk
Cambridge Pod Patrol
Kingsley Park Site Improvements
Little Fresh Pond Restoration Project
Fresh Pond Reservation Users
Calendar of Events

Little Fresh Pond Shoreline Restoration and Drainage Improvement Project

Goal: Stabilize the entire shoreline of Little Fresh Pond and a portion of Fresh Pond

The entire shoreline of Little Fresh Pond has been stabilized using coir fascines (coconut fiber logs) and re-graded to reduce bank steepness. The new slopes have been temporarily stabilized with erosion control fabric, and permanently strengthened through seeding and planting with native groundcovers, shrubs, and canopy trees. The fascines were planted by volunteers on Earth Day 2006 using herbaceous wetland plugs.  Look here for pictures of the event.

Featured Information
Little Fresh Pond Shoreline Restoration and Drainage Improvement Project
Featured Information

Staking of the coir fascines - Philip Parker (03.13.06)

Newly regraded shoreline of Little Fresh Pond with erosion control fabric - Philip Parker (04.20.06)

About Us Publications Contact Us Disclaimer