Jump to Page Content City of Cambridge Home Page
Administration Distribution Engineering Water Operations Watershed Water Board Home
Water Department Home
Cambridge Water Department
Printer-friendly Version
Water Department Home
Administration Division Home
FAQ
Areas of Interest
Staff
Key Department Contacts
Tours
My Water Meter
Customer Service/Billing Inquiries
Conserve Water
Leak Detection Program
Permits
Calendar of Events
Automated Meter Reading (AMR)
Cross Connection Control Program
Facility Information
Water Week
Administration Division
Calendar of Events

Permits

Water Works Construction Permit
> Download the Permit

PERMITS are ONLY issued at times listed below:

MONDAY:                           From 7:00am-7:30pm

TUESDAY-THURSDAY     From 7:00am-3:00pm   

FRIDAY                                 From 7:00am-12noon    

Instructioins:

 

It is the responsibility of the property owner to  verify and obtain all applicable permits. All water works contruction projects shall follow these procedures.

The City's authorized representatives must approve the proposed construction;written permits must be obtained from appropriate agencies and all permit fees paid befor contruction begins. Contractors working on City roads , right of ways, private property  and/or city owned utilities must be bonded with the City of Cambridge.

Final plans shall conform with the latest edition of the rules and regulations of the City of Cambridge and these procedures and shall receive approval of the appropriate officials before improvements are made.

A minimum of 72 hours notice shall be given to the CWD prior to starting construction. Emergency work will be approved by the Distrubution Manager or a designated representative.

The Contractor shall be responsible for the preparation and submittal of three sets of blue line record drawings to the CWD within 60 days after completion of construction. Record drawings shall be a full set of drawings showing all details of the construction.  A registered professional engineer shall certify record drawings as true and correct.

Any questions? Please call 617 349-4137

Featured Information
Design & Construction Standards
Irrigation Meter Information Packet with Application .pdf


About Us Publications Contact Us Disclaimer