Specifications for Work on Public Right-of-Way
Traffic Counts

1. If the project plan includes parking meters, the contractor must install the meter poles at the locations to be marked out in the field by T, P & T.   T, P &  T will then install the meter head on these newly installed meter poles.

2.  Contractor must install traffic and parking signage, including post.

3.  All pavement markings must be reviewed and approved by T, P & T and installed by an approved pavement marking contractor at a schedule determined by TP&T.

 4.  Link to DPW Specifications.